December 10 2017 0Comment
Slėginio nuotekų tinklo Latvių g. Vilniuje remonto darbai. Inžineriniai tinklai, nuotekų šalinimo tinklų klojimas D710 (uždaru būdu)

Rehabilitation and Reconstruction of Water and Wastewater Infrastructure.

  • Vilnius city water and wastewater main supply network renovation – 41,4 km, 4,9 km of trenchless rehabilitation with PE sliplining and 2,1 km of ductile iron pipes. Reconstruction of existing 311 water network chambers.
  • Trenchless rehabilitation of Vilnius city main pressure sewage network line 2 x 700, length 0,8 km.
  • Emergency repair works of Vilnius city sewage and water network in 2012 – 2017. Total length 12,1 km (8,5 km trenchless repair works).

sm